Saltear al contenido principal
Últimas posturas: 16/02/2026 12:55 PM · BC1DPP05 · USD 100.6 · 664,886 ● 16/02/2026 12:55 PM · BC1IES01 · DOP 100 · 16,450,000 ● 16/02/2026 12:55 PM · BSDR2036 · DOP 111.553557 · 1,000,000 ● 16/02/2026 12:55 PM · BSRD2037 · USD 108.020627 · 100,000 ● 16/02/2026 12:55 PM · BSRD2041 · USD 92.229248 · 100,000 ● 16/02/2026 12:55 PM · BSRD2060 · USD 90.845963 · 100,000 ● 16/02/2026 12:55 PM · MH22034 · DOP 125.70645 · 1,000,000 ● 16/02/2026 12:55 PM · MH32029 · DOP 114.929235 · 1,000,000 ● 16/02/2026 12:55 PM · MHUS2027 · USD 104.099478 · 100,000 ● 16/02/2026 12:55 PM · MHUS2029 · USD 115.984196 · 100,000 ● 16/02/2026 12:55 PM · NO030328 · DOP 100.904573 · 1,000,000 ● 16/02/2026 12:55 PM · NO111226 · DOP 102.323444 · 1,000,000 ● 16/02/2026 12:55 PM · NO150928 · DOP 104.483576 · 1,500,000 ● 16/02/2026 12:55 PM · NO271126 · DOP 100.359251 · 1,000,000 ● 16/02/2026 12:55 PM · BSDR2036 · DOP 106.372773 · 1,000,000 ● 16/02/2026 12:55 PM · BSRD2037 · USD 106.76506 · 100,000 ● 16/02/2026 12:55 PM · BSRD2041 · USD 90.411071 · 100,000 ● 16/02/2026 12:55 PM · BSRD2060 · USD 88.996539 · 100,000 ● 16/02/2026 12:55 PM · MH22034 · DOP 117.863592 · 1,000,000 ● 16/02/2026 12:55 PM · MH32029 · DOP 109.710026 · 1,000,000 ●

Dominican Power Partners (DPP)

¿Qué es el Dominican Power Partners (DPP)?

Primera inversión de AES en República Dominicana

Capacidad instalada de 236 MW, con dos turbinas ciclo abierto de 118 MW

Generación a base de gas natural

Su localización céntrica y su tecnología lo hace ideal para proveer servicios auxiliares al Sistema Nacional Interconectado.

Archivos

Próximo Evento

Siguientes…

Subscribete a nuestro newsletter

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam
nonummy nibh euismod tincidunt
Oh no… Este formulario no existe. Regresar a la página de formas de administrar y seleccionar una forma diferente.
Volver arriba